I’m feeling panicked that there is not enough time to get this Yurt built with all of the other stuff that needs preparation for BM. So it’s time to get organized and on the stick!!

1) Add edge wrap and zippers to 4 edges of roof panel #1.
2) Add edge wrap and zippers to #2 roof set.
3) Assemble #2 upper and lower roof sections.
4) Test zip #1 and #2 roof panels together.
5) Add K-Hinge to #2 wall/roof panels, with blue lettering facing inward.
6) Draw CAD of Yurt to figure out external K-Hinge width.
7)Create #3 wall and roof assembly by Monday.