Wed 19 Aug 2009
Roof and Wall Assembly Finished!!!
Posted by under shelter , yurtComments Off on Roof and Wall Assembly Finished!!!
This was the very last roof and wall panels to be assembled. So I thought I’d get more of the process documented.
Getting ready to add glue to the lower 3 inches of the lower roof panel. Then it will be installed on the one inch K-Hinge/wall panel.
You can see that the caulking gun is loaded but low on glue. Always have a spare tube of glue is sitting by the ready. The 2 inch roll of masking tape is used to lift the upper roof panel up so that I can apply the glue without interference. I think I used about 8 28oz tubes of Liquid Nails so far.
Adding 2 inch wide masking tape to the underside of the top corner keeps glue off of it during assembly. That blue line on the lower roof panel is for the 3 inch wide glue line.
Wall with one inch K-Hinge waiting for roof panel installation.
The one inch K-Hinge ready for the roof assembly to be added.
The one inch K-Hinge ready for the roof assembly to be added.
All of the roof and wall panels are finally assembled!!!! They just need the bottom edges covered, anchors added, and side hinges glued on.