All of the upper and lower roof panels have been hinged together and have had the zippers added to their sides. Tomorrow we are going to see how all of the roof panels are going to zip together without the walls. It will be a good dry run. I bought several more yards of canvas and a few more 28oz tubes of Liquid Nails. There are many 8 foot long hinges to be glued to these panels in the future.